Case Study

Asbestos Case Studies

Client: O’Garas

Project: Salford Units – Demolition and Strip Out

O’Garas Salford Units

Overview

This project required a full soft strip of internal units, removing all mechanical and electrical installations, asbestos roof sheets, and controlled demolition back to slab. The works were carried out by a team of eight operatives, using two scissor lifts and a 13-tonne excavator fitted with a shear attachment.

Health and safety were central throughout the works. Licensed asbestos removal procedures were followed in accordance with regulations, ensuring safe handling despite challenging weather conditions. Proximity to the Network Rail boundary required additional planning and precautions; the team dismantled the high blockwork wall adjacent to the fence by hand from scissor lifts to avoid risk of debris. Only once this was complete did the excavator continue with the remaining demolition, supported by two experienced banksmen.

Results

The works were delivered on time and without incident, with all demolition completed safely despite difficult site conditions. The client commended the team for their careful planning, safe execution, and effective use of resources.