This project involved an emergency response in a live warehouse environment after a tray containing approximately 50m of 185mm four-core cable (x4) had fallen. Fortunately, no injuries were caused, and power was immediately isolated at the transformer to secure the site. With no strict deadline, the focus was on careful planning and safe execution of the works.
A four-man team carried out the project using two scissor lifts and an electric-powered lifting solution suitable for indoor use. A banksman was assigned to maintain control of all lifting operations and ensure safe working distances were observed. Given the sensitivity of the task, additional preparation was built into the site-specific RAMS to address the unusual risks involved in handling live-service equipment and overhead cables.
The tray and cables were safely counterbalanced and secured, while two operatives in the scissor lift applied slings to take the remaining load. Once stabilised, the cables were systematically cut, lowered, and removed under constant supervision.
The emergency works were completed without incident, with all cables safely removed and the warehouse made secure. The project highlighted the team’s ability to adapt RAMS for sensitive conditions and to deliver a controlled outcome in a potentially hazardous situation.
Bingley Demolition Ltd delivers professional, safety-focused demolition solutions, trusted for on-time, on-budget performance, expert project management, and outstanding client service from initial costing to final completion.